Two inflatable paddle boards floating on calm water at first light.

01Weihai, Shandong · OEM & ODM

Inflatable paddle boards, built in Weihai

We build inflatable paddle boards in Weihai, China, for importers, private labels and rental fleets.

Every board leaves the plant with the full accessory bundle in the box.

36.9°N · Weihai · Shandong

02What we build

Shapes from 8′ to 12′6″ come off one floor.

Our shapes run from 8′ to 12′6″, so a retail line and a rental fleet come off one floor. Pick a shape and we take it to your deck print, your pad and your bundle.

All-round inflatable paddle board, deck side up on a plain floor.
Teal deck, cream pad, compass print at the tail.
Expedition inflatable paddle board, deck side up on a plain floor.
Camo deck, olive pad, bungee net at the nose.
Fitness inflatable paddle board, deck side up on a plain floor.
Blue and lime deck, seat strapped mid-deck.
Touring inflatable paddle board, deck side up on a plain floor.
Cream deck, olive pad set back at the tail.
Sport inflatable paddle board, deck side up on a plain floor.
Narrow nose, lime chevrons, pad held aft.
Print deck inflatable paddle board, deck side up on a plain floor.
Two printed decks, olive and pink.

03What you set

Your outline, your print, your pad, your bundle.

Outline, deck print, pad pattern, colour and bundle are yours to set. We sample your spec in 10 to 15 days before anything runs on the line.

  • 01Outline
  • 02Deck print
  • 03Pad pattern
  • 04Bundle
Inflatable paddle board deck covered by an abstract printed graphic.
Artwork printed nose to tail on a deck.
Worker brushing adhesive onto a printed sheet beside a glue pot.
Adhesive brushed onto a printed sheet at the glue bench.

04Pressure

Every seam is sprayed, then the board rests.

Every seam gets a 100% soap spray test, then 24 hours of rest for a second leak check. Deck work adds 24 hours of curing, and packing waits another 12.

  1. 01 100% soap spray on every seam
  2. 02 24 h rest, second leak check
  3. 03 24 h cure after deck work
  4. 04 12 h rest before packing
Worker hosing down a stack of boards during the leak test.
A stack of boards rinsed at the leak-test bay.
Operator working a hose along a stack of boards.
Boards stacked in the test bay, hose in hand.
QC worker checking boards in a pressure-holding rack.
An inspector marks up a board in the rack.
Worker cleaning a finished paddle board with a cloth.
A finished board wiped down before packing.

05The floor

Seventy people, one plant.

Seventy people work this plant: six in R&D, five in QC, the rest on the floor. The press, the glue benches and the packing tables all sit in our Weihai plant.

The roller-pressing floor, end to end.
Roller press closing a board with stacks of boards behind it.
The roller press at work, board stacks behind.

06What it takes

Ten to fifteen days for a sample, forty-five for a run.

Lead times and bundle
Sample10–15 days
Production45 days
BundleBag · pump · paddle · leash · fin · phone pouch · dry bag · repair kit
Add-onsVest · cup holder · fishing bracket · multi-mount · seat
Worker folding and bagging a finished paddle board.
A finished board folded into its bag.

MOQ and price follow the brief.

07 · Next step

Send shapes, deck print and volume.

We come back with a build plan and a price. This form prepares the brief in this browser — nothing leaves the page until you copy it.